Skip to content
New Hauler
Menu

7 min · reviewed November 22, 2026 · the New Hauler team

How to read a rate confirmation

The rate confirmation is the contract for that load. The phone quote is a conversation.

A rate confirmation should name the broker, the carrier, the pickup, the delivery, the commodity, the weight, the equipment, and the money. If a line is blank, it is not “standard.” It is unpaid until someone writes it down.

The money lines

  • Linehaul versus all-in. If the confirmation says the rate includes fuel, you do not invoice a surcharge later.
  • Detention. The clock should say when it starts and what it pays per hour. “Driver must note the time” means you write it on the bill before you leave.
  • Lumper. Either the broker pays the receipt or you will.
  • Layover and truck-ordered-not-used. If they are absent, assume they are zero.
  • Quick pay. The percent is a discount you give the broker. It is not factoring, and stacking both can violate one of the contracts.

The broker

Check the broker’s MC and the $75,000 bond or trust the same way you check your own insurance. 49 CFR 387.307 is the bond rule. A double-brokering clause that makes you haul for an unnamed carrier is a reason to decline the load, not a reason to feel flattered.

After you sign

Save the PDF. Invoice that number, not the number you remember. If the broker changes the rate in a second confirmation, the later signed one is the one a factor will fund and a court would rather read. This is commercial paperwork, not legal advice about your particular dispute.

Keep going

Sources

  1. 49 CFR 387.307, property broker security · eCFR
  2. SAFER company snapshot · FMCSA

Accessed November 22, 2026.